LogoBETABeta
Arlington 2014: Part 6: Additional Details

This Old House

Season 35Episode 14Aired 2014-02-08
Arlington 2014: Part 6: Additional Details

Arlington 2014: Part 6: Additional Details

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.